Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Bombardier Inc. T.BBD.A

Alternate Symbol(s):  BDRXF | BDRAF | BDRBF | T.BBD.B | T.BBD.PR.B | T.BBD.PR.C | T.BBD.PR.D | BDRPF | BOMBF

Bombardier Inc. is a Canada-based manufacturer of business aircraft with a global network of service centers. The Company is focused on designing, manufacturing and servicing business jets. The Company has a worldwide fleet of more than 5,000 aircraft in service with a variety of multinational corporations, charter and fractional ownership providers, governments and private individuals. It operates aerostructure, assembly and completion facilities in Canada, the United States and Mexico. Its robust customer support network services the Learjet, Challenger and Global families of aircraft, and includes facilities in strategic locations in the United States and Canada, as well as in the United Kingdom, Germany, France, Switzerland, Austria, the United Arab Emirates, Singapore, China and Australia. The Company's jets include Challenger 350, Challenger 3500, Challenger 650, Global 5500, Global 6500, Global 7500 and Global 8000.


TSX:BBD.A - Post by User

Bullboard Posts
Post by jammerhon Jun 21, 2010 7:56pm
409 Views
Post# 17208678

First CSeries Engineering Drawings

First CSeries Engineering Drawings
This is considered a significant milestone since it signals the design "freeze" - a stage where design changes are stopped, or frozen. It is the point in the development stage from which the current no more changes are expected to be made. point. Officially the freeze starts next month, but as the piece below explains for the most part its already frozen:

DATE:18/06/10
SOURCE:Air Transport Intelligence news
Bombardier releases first CSeries engineering drawings

Bombardier has released the first engineering drawings for production of the first CS100 flight test aircraft.

The final design for the lower left-hand skin of the cockpit was released on 10 June, says Hugues Lessard, vice president of Bombardier's Saint-Laurent plant in Montreal.

With the first drawing now released, Lessard says the first stretch form block tool that will accommodate the first skin panel is currently being cured.

While the company says it expects to achieve design freeze on its 110-seat CS100 airliner next month, the design is largely considered to be frozen, save for some aircraft systems.

"In most cases, we consider ourselves...in the detailed design phase today, and we have started to release manufacturing drawings," says Lessard.

Cockpit fabrication for the first aircraft is expected to begin by year-end, says Lessard.

The company's Saint-Laurent facility will be responsible for full fabrication of the CSeries forward and aft fuselage.

Part of the Saint-Laurent site is being converted from a metal storage and cutting area to revamped space for use by the CSeries programme and aims to leverage lean manufacturing technologies by eliminating overhead cranes and operating with a continuous moving line guided by automated guided vehicles (AGV).

As the new facility is being prepared, Bombardier is in the process of assembling a composite paneled, aluminum framed aft fuselage demonstrator.

Sylvain Lajoie, CSeries programme director for the Saint-Laurent facility, says that the mixed material design avoids galvanic corrosion between carbon fibre and aluminum by inserting a thin film where the two materials meet.

The test structure, once complete, will be put through thermal stress tests to evaluate the differing coefficients of expansion of the carbon fibre panels and the metal structure.

The Pratt & Whitney PW1000G-powered CS100 is expected to make its first flight in 2012 and enter service in 2013.

Bullboard Posts