2012 estimated productionI just noticed that the 2012 guidance is for Cosmos to produce 50 % of the total production.
From my previous post, open pit production is estimated to be 65,000 oz which means that total production in 2012 will be about 130,000 oz.
The open pit is forecasted at about $1050 per oz and Cosmos at $552 per oz, for an average cash cost of about $800 per oz.
Its easy to calculate from this that 2012 raw cash flow will be about $100 million.