RE:ThoughtsRodney15: It seems low probability it will be shut down. The tunnel will get built. Didn't a judge rule recently that the east line could reopen? They probably make enough $ on line 5 to absorb the cost of dragging out the legal battle long enough to have the tunnel built. The Enbridge VP was confident enough to call this a distraction.