FCU Initial RE m3 per Drill Hole FCU | | | | | |
6,726.8 | Wireframe m3 per drill hole | | |
| | | | | |
Nxe | | | | | |
28,340.2 | Wireframe m3 per drill hole | | |
| | | | | |
| | | | | |
| | | | | |
FCU | | | | | |
# Drill Holes | | | | |
194 | R780E | | | | |
41 | R00E | | | | |
235 | PLS Initial PEA | | | |
| | | | | |
| Not included in Initial PEA | | |
| 1. R600W 5x | | | |
| 2. R1620E 2x | | | |
| | | | | |
Nxe | | | | | |
# Drill Holes | | | | |
82 | per Nxe Feb 2017 Corporate presentation notes |
Nxe 43-101 Initial
VOLUME COMPARISON Wireframe volumes were compared to block volumes for each domain at the Arrow deposit. This comparison is summarized in Table 14-13 and results show that there is good agreement between the wireframe volumes and block model volume. The difference is less than 2%, except for the 101, 103, 111, 207, and 311 domains where the difference ranges from 2.1% to 4.1% due to the small volume of the wireframes combined with the whole block approach.
The estimated total volume of the wireframe models is 2,323,900 m3, while the volume of the block model at a zero grade cut-off is 2,329,700 m3.
FCU 43-101 Initial
The estimated total volume of the wireframe models is 1,580,800 m3 , while the volume of the block model at a zero grade cut-off is 1,579,700 m3 . Results are listed by domain in Table 14-11.