PLS Deposit to feed Eastern existing Mills watch for...CGN Mining / China news on discussions with Sask govt and Cameco to secure ore processing Letter of Intent. China have mastered bulk transporation of materials. Sak govt pressure to get folks back working.
PFS Mine Plan with any options listed to the design basis facilities to utilize existing Eastern infrastructure and or revised schedule targets to EA (2019 or sooner). PFS issued Target Q4 2018.
Should get an update soon on the Summer Drilling program including the expansion drilling of the R780E zone resource detailed in the latest PLS presentation (3x drill targets section L555E).
Dev and Ross have stated for years "Through successful exploration programs completed to date, Triple R has evolved into a large, near surface, basement hosted, structurally controlled high-grade uranium deposit." ...the next producing Mine & OPEN PIT Mine in the Athabasca Basin!