RE:Drill Holes abandoned...?If you're reading ceo.ca/fvl... then what was said that you should look forward to the odd # results.
2004 and 2006 were lost.
2002 - This wasn't abandoned. We received results in September.
2003 - 587 metres depth (50 metres east of 2001).
2004 - 420 metres depth (50 metres west of 2001), however it was lost.
2005 - 645 metres depth (100 metres north of 2001), it was terminated.
2006 - 76 metres depth (140 metres southwest of 2001), however it was lost.
2007 - Drilling in progress (140 metres southwest of 2001).