Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Excelsior Mining Corp T.MIN

Alternate Symbol(s):  EXMGF

Excelsior Mining Corp. is a Canada-based mineral exploration and production company. The Company owns and operates the Gunnison Copper Project in Cochise County, Arizona. The Gunnison Copper Project is an in-situ recovery copper extraction project that is permitted to produce approximately 125 million pounds per year of copper cathode production. The Company also owns the past producing Johnson Camp Mine and a portfolio of exploration projects, including the Peabody Sill and the Strong and Harris deposits. Its 100% owned Johnson Camp Mine is located over one mile from the wellfield. The Strong and Harris copper-zinc-silver deposit is located about 1.3 miles north of its Johnson Camp SX-EW facility. The Company is also evaluating the oxide and sulfide potential of all of its mining assets.


TSX:MIN - Post by User

Comment by rexrexon Feb 24, 2021 11:29am
88 Views
Post# 32647052

RE:RE:RE:due to strong investor demand - is all you need to know

RE:RE:RE:due to strong investor demand - is all you need to know
rexrex wrote: Glass half empty kind of thing. The positive us from what you are implying is that half are working and half are not. I will re-quote from what the CEO said in his November update. All the explanation is there.


Excelsior Mining Provides Operations Update Phoenix, Arizona--(Newsfile Corp. - November 10, 2020) - Excelsior Mining Corp. (TSX: MIN) (FSE: 3XS) (OTCQX: EXMGF) ("Excelsior" or the "Company") is pleased to provide the following update for the Gunnison Copper Project in Arizona. Limited operations in response to the COVID-19 pandemic have been implemented in order to optimize many aspects of the production wellfield. Highlights from the wellfield optimization program include: The issue of copper precipitates and other precipitates blocking wells has been solved; the upgrades to the wellfield implemented earlier in the year have proven effective; Copper grades in the wells that have been consistently operated are in-line with expectations; These activities have generated sufficient copper in solution to commence operation of the Solvent Extraction-Electrowinning (SX-EW) production facility, which has been turned on; Copper cathode production is expected to commence within 30 days; Staffing levels remain reduced and restricted due to the COVID-19 Pandemic. Operations have been conducted in a safe manner with only one COVID-19 case at Gunnison reported. In response, successful contact tracing and isolation measures were implemented without any requirement to shut-down operations; Expansion of activities to surrounding wells is occurring, with a view to ramping-up to full, nameplate, capacity through 2021; and It is expected that additional time will be required during this ramp-up to optimize the wells and resolve any challenges as they occur. Stephen Twyerould, President and CEO, said, "We are encouraged by the results of our wellfield optimization program and the team's ability to identify and resolve issues as they arise. The upgrades to the wellfield have proven successful; we can easily and efficiently switch back and forth between injection and recovery for backflushing and flow reversals, and this system has shown substantial improvement in well efficiency. After only three-months of acid injection, we have collected enough copper to start initial production; this will allow us to commission and evaluate SX-EW capabilities. Optimization programs are being rolled out to additional wells and we are confident that production will be expanded over the coming months." Excelsior previously announced the commencement of acid injection and solution recovery through a limited number of wells. The purpose of these activities was to test the modified (retro-fit) wells under small-scale operating conditions and to gain knowledge on the new "Push-Pull" operating procedures (see Excelsior news release dated August 12, 2020). The smaller scale operation also allowed Excelsior to confirm that it could establish operations that minimized health and safety risks from the transmission of COVID-19. Results from current testing confirms that several wells have achieved partial acid breakthrough; these wells have shown no signs of precipitates blocking or restricting recovery flow. Therefore, Excelsior has confirmed that the need to backflush in order to remove precipitates diminishes or goes away entirely once breakthrough has occurred. Wells that have not broken through still require intermittent back flushing using the modified infrastructure, which has proven very effective. Twyerould added, "The management team is rapidly gaining the knowledge and expertise necessary to optimize wellfield performance. A variety of issues still need to be worked through, such as how to minimize the impact of carbon-dioxide on fluid flows and how best to maximize flow rates in general; however, we believe that all of these challenges are temporary and will not impact long-term copper production. We expect to be able to expand operations to include the entire wellfield in the very near future." Excelsior is confident that a gradual expansion of wellfield operations will allow for operations that minimizes the risks of COVID-19 transmission. The ability of Excelsior to optimize the entire wellfield may be impacted by supply chain disruptions related to the on-going pandemic.
<< Previous
Bullboard Posts
Next >>