Fall drillingDoes anybody have a clue why the company would drill these and not have them analyzed? It makes absolutely no sense to me! There are some pretty long holes.
During October and November of 2014, Wellgreen Platinum completed 2,916.49 m of drilling in 8 holes. Most holes were started with an RC rig and finished with a core rig. Holes were sampled but have not yet been analyzed. Table 10.8 Wellgreen Platinum 2014 Drill Collars
Hole-ID Length (m)
WS14-226 773
WS14-227 590
WS14-228 413.74
WS14-229 590
WS14-230 63.85
WS14-231 430.1
MW14-10A 6.3
MW14-10B 49.5