RE:Copper Mine?Good anaysis Mack. They were fortunate to have the pumps in place. They were short on surface transfer system. Now it is in place. Hoisting is good.
The big thing is the mill tails. Sounds like they have it coming. Equipment is funny. Some equip. can be run at max and it loves the work. Other equip. can only be run at 75% max. or it fails. It would appear that is the case with much of the tails equip. They seam to have a plan to reduce volume.
They resume stope mining this month so hopefully the are at steady nameplare and 2% plus headgrade by march.
nf