RE:COG (cut off grade) for drilling of oxides is 0.25 g/t Auxyz_trader1 wrote: Very encouraging results
- 61.2 meters @ 0.82 g/t Au and 16.59 g/t Ag
- 25.7 meters @ 0.53 g/t Au and 17.49 g/t Ag
- 84.6 meters @ 0.36 g/t Au and 3.82 g/t Ag
any intercept above 0.25 g/t AU according to their presentation for Taguas is economical.
very encouraging results so far
and assays pending for higher grade
- Drilling has commenced in Cerro Campamento in order to define the shallower part of high gold grade oxides, which can potentially be mined by open pit.
- 3 core holes totaling 251.2 meters.
- All assays are pending.
xyz
One thing I noticed was the volume of drilling they are doing. 21,400 Meters of drilling complete by Fiscal Q2 which is March 31st 2023 Thats a lot of results were going to see for such a small Market Cap company
- Cerros Taguas
-
- Phase 1 Infill drilling (6,000 meters) Current
- Phase-2 (additional 11,000 meters) complete Q2 Fiscal 2023
- Cerro Campamento
-
- Phase 1 Infill drilling (1,400 meters) Current
- Phase-2 (additional 3,000 meters) complete Q2 Fiscal 2023
Plus this note was positive Cerros Taguas Results
more high grades structures than previously modeled: