RE:RE:conf call today... anyone listen yet?
Also positive on conversion of 9-2 from an injection well to a production well. It will take 45 to 60 days to determine the MW potenial of this well.
Will be hooking up 9-4 with a temporary 18" pipe to the power plant. Final piping will be a 20" pipe. (approximately 24% greater cross sectional area)
Well drill is still on-site and maybe stored on-site for quite a while. ( i.e. drill is availabe if required)