Pelletization time line
Was doing some more DD on CO2 in Sweden and came across an initiative called HYBRIT. HYBRIT is a JV between LKAB (mining and pelletization) SSAB (steel production) and Vattenfall (electricity). The JVs objective is to produce a fossil free steel. Their goal is to have a plant in operation by 2025. By extension I would think that LKAB would have to have their pelletization process in place by then.
Some links
https://im-mining.com/2020/06/02/ssab-lkab-vattenfall-plot-hybrit-pilot-production-pathway/
https://www.hybritdevelopment.com/articles/three-hybrit-pilot-projects
(They mention plasma briefly in the HYBRITT link)
Could the steel industry company Peter mentions in pree release be SSAB??