RE: Year end results due next weekI think the production is up significantly with the completed expansion. They are talkin run rates of 6900 tpd , the third quarter ran about 4000 tpd @ 3.92 g/t I think the Q4 was 5500 tpd the grade must be lower and costs higher but POG was great. This Q1 2010 should be spectacular with peak 6900 tpd.
I can hardly wait for the drill results around the Nayafe pit as I think he said 6 g/t at the BMO Mining Conference