Russians have good timing The offshore section of the pipeline was filled with gas in November 2019.[11] The pipeline is planned to be inaugurated on 8 January 2020.[12]
Technical features[edit]
The pipeline is estimated to cost €11.4 billion.[8] The pipeline has two lines with a total capacity of 31.5 billion m3/a (1.11 trillion cu ft/a) of natural gas