RE:LuiperdFurthermore, you don't run and cement casing to TD in a dry hole and then invite the Minister of Energy to observe what a good job you did running pipe. Nor does the local boss of Total announce that they are proceeding to the second phase of evaluation after having run pipe if it is a dry hole.
The main unknowns at this stage are surely (1) the exact nature of the fluid - wet gas? gassy oil?, and (2) the thickness and quality of the reservoir(s). Both these will be answered by a properly conducted testing programme allied with the log and core data already acquired.