Post by
STEELE2 on Oct 18, 2021 4:24pm
Solid bids coming in, up we go folks
“These results are particularly significant as this area represents a 300-metre-long drilling Gap between two recent drill sections that returned excellent results for us. Based on vein textures we expect the “boiling zone” to begin some 100 metres below surface. Within that zone our emerging experience will be for us to intersect good grades both in the vein and the stockwork vein system adjacent to it. Clearly, these results provide strong encouragement for our upcoming road construction and core drilling program both within the Gap and along strike to the north. The opportunity to drill an untested 1500-metre-long extension of the vein system to the south remains open to us.”