CorrectionI have stated that in 2020 Brixton will drill the Chivas 'Corridor'. My bad. There is no such thing.
In fact Brixton will drill the Camp Creek 'Corridor' in 2020. These holes may be the stepouts to hole #150 that the six Chivas holes were not. Chivas is over 3kms from #150.
Brixton is using Camp Creek Hole #162 as a reference. That hole was 1km from hole #150. If drilling is done from #162 towards #150, closing that 1000 metre gap, we'll have our stepouts.
I'm guardedly optimistic. Brixton thinks it has a big system on it's hands at Thorn. Drilling the Camp Creek Corridor is a step in the right direction towards proving the big system hypothesis and, literally, towards #150.