RE: 7 to 14 days
12 drill holes X 600 meter is 7200 meters
I supervized some driling many years ago. Aside from setting up the drill that would take between 24 to 48 hours depending on the soil conditions (and I believe everything is frozen over so a muskeg will do the job...). They are able to drill 10 to 20 meters per hour. On a 24 hour basis using 3 drills this 7200 meters program would indeed take about 2 weeks. Hopefully we will get visual reports of the drill core before CLF takes over as operator! I believe they will starve us of info just to get the SP down!