waiting for SRK to update PEAWhile we wait, maybe SRK will surprise us and come out with a revised PEA and new tonnage number, before the AGM? Finding the new borate zone/layers when doing the infill drilling at Piskanja has got to help increase the tonnage. Also, will be interesting to see how much tonnage gets moved into measured category. Maybe this is what a jv partner is looking for?
Hole EV-142 intersected a total of 37.7 meters of mineralization within the Piskanja deposit, from five known borate layers and two new intervals containing borate mineralization, including an intersection of 5 meters averaging 30.56% B2O3. Hole EV-142A intersected a total of 14.1 meters of mineralization from one borate layer, including 5.2 meters of 34.61% B2O3. EVP-143 intersected a total of 43.1 meters of mineralization from 3 known borate layers and two new mineralization zone, including 9.8 meters of 37.0% B2O3 and 7.85 meters of 32.16% B2O3. https://www.erinventures.com/media/nws_d.php?id=134
Hole EV146 intersected a total of 17.23 meters of mineralization averaging 26.23% B2O3, from within two known borate layers and one new mineralized interval, including an intersection of 12.98 meters averaging 33.22% B2O3.
Hole EV147 was used for mineralogy, petrology and sedimentology research, and intersected three borate layers totaling 16.1 meters of 20.68% B2O3, including 10.36 meters averaging 29.80% B2O3.
https://www.erinventures.com/media/nws_d.php?id=135
Hole EV-141 returned 32.53 meters of mineralization within 5 zones, including 2 newly discovered zones. Results from this hole include 17.9 meters of 35.18% B2O3 and 7.88 meters averaging 35.46% B2O3.