Revised PEA - Feb 2016BB, you would think with SRK's geologists on the ground while Erin drilled the 10 infill holes that a quick revision to the PEA should be possible, but remember when we were anxiously waiting for the PEA, it was out about 4 months after the time line which Tim thought it would be done by!
Also why did they never go back and complete the 14 holes as originally announced? looks like we are short 4
May 11,2015- This work program includes: infill drilling of 14 holes (for a total of approximately 4,000 meters) on a 50 by 50 meter grid to raise the confidence level of the mineral resource to "measured" in the central part of the deposit; geochemical testing of the drill cores; continuation of ongoing hydrogeological monitoring; geodetic revision of the situation plan, and; geodetic preparation of a topographic plan. It is anticipated that Erin will require approximately 4 months to complete this work.
https://www.erinventures.com/media/nws_d.php?id=122
as you can see SRK has had plenty of time to update our PEA!