RE:RE:RE:RE:RE:HaveAs I said! They need to start hitting some higher grade holes. The widths are fantastic grades not so much. So look at their last hole release. Here is one to consider! Great widths but 1/2 the gold is from 97 meters. So you are mining alot of really low grade to get there. Remember the .47 gpt includes the 27m of 1.5 at 97 meters deep. So you are stripping 24.4 m then you are mining 72.8 m of .33 gpt to get to the 27m of 1.5. Maybe just me but can't see how that can be economic at todays gold price and cost to build a mine! Maybe I am missing something here?
- 177.9 metres ("m") of 0.47 g/t Au from 24.4 m in DDH AX-22-251
- Including 27.1 m of 1.50 g/t Au from 97.2 m