Similar grade and throughput ...Bralorne
Bralorne produces 539.2 oz Au at Bralorne in February
2014-04-23 09:15 ET - News Release
Dr. Matt Ball reports
BRALORNE FEBRUARY 2014 PRODUCTION UP 192% OVER FEBRUARY 2013
Bralorne Gold Mines Ltd. has provided February, 2014, production results from its Bralorne gold project located on the Bralorne property near Gold Bridge, B.C.
FEBRUARY, 2014 PRODUCTION RESULTS Total mill Feed Total feed grade Recovery Recovered Flotation gold Days of (metric gold gold gold gold produced Mine operation tonnes) (g/t) (%) (gravity) (contained) (oz) Bralorne 28 2,532 7.5 88 246.2 293.1 539.2
"I'm very pleased to report another month of consistent production as anticipated with improved grades," said Dr. Matt Ball, president, Bralorne Gold Mines.
Bralorne production comparison
Production numbers for February, 2014, are presented in the associated table along with comparative figures for 2013. Mill throughput averaged 106 metric tonnes per day operated.
PRODUCTION COMPARISON February, 2014 February, 2013 Metric tonnes milled 2,532 2,228 Mill availability (%) 94 83 Mill throughput (tonnes/day operated) 96 95 Feed grade (g/t Au) 7.5 4.6 Gravity gold ounces 246.2 127.7 Flotation con. metric tonnes 59.5 40.5 Flotation con. grade g/t Au 153.3 117.5 Flotation con. ounces 293.1 152.9 Total recovered ounces 539.2 280.6 Recovery (%) 88 86