Post by
coffintrader on Sep 09, 2011 10:25am
Drilling
The drilling program anticipates, as a first phase, approximately 20 holes totalling approximately 7,000 metres to test the on-strike and downdip extension of surface outcropping and the historically mined copper-gold-silver mineralization. All drill roads have been completed, as well as all drill platforms, and a water source for the drill has been secured. The surface rights to a majority of the mineralized area, including all surface lands covering the area to be drilled, have been secured either by outright purchase or by long-term leasing.