If you look at their drill map
https://www.grandeportage.com/projects/herbert-gold-project/
The 2020 drill map it shows the 2 veins just below Goat Creek Vein ( 1 vein they just found is unnamed as of yet!) The other vein is I presume named the Ridge Vein!
Take a look at the map and you will see drill hole 20T-6 & 20T-7 if you plot the line then you see the veining outline.
Also:
The Company has now drilled 8 holes, two of which are ongoing and has up to 15 more holes planned. At least 7 intervals contained visible gold with all of the holes encountering multiple veins. Sample results are forthcoming with extremely lengthy turn-around times encountered this season.
---------------------------------------------------------------------------------------------------------------------------------
A total then of 21 holes, the exact number shown on the 2020 drill map, but now they have added another 1 hole:
An additional drill hole has been added to the season's plan from the U Pad which targets an area near the eastern limit of drilling on the Main vein where there are no historical drill holes at an elevation of -50 meters and about half way between an intercept in 10D-2 (1.15m-7.65gpt/gold) and an intercept in this year's 20T-6 about 200 meters away (deeper and eastward) which showed strong alteration, minor brecciated quartz and some visible gold in the core.
So if the map shows 21 drill holes being drilled. And then they just today say or infer that there is now 23 holes ( 8 holes (2 of which are both being drilled right now) and another 15 holes it says that too me is a total of 23 holes not 21 + 1.
And what gets me is this was the plan for drilling around that 21 holes proir too Erics money was it not?