read thisThe drilling has clarified the geometry and thickness of mineralization as intercepted in hole LA-10, 142 metres grading 2.59 per cent Cu, 1.91 per cent Zn and 2.5 g/t Au (reported in Stockwatch on June 6, 2007). The company is now developing a far better geological understanding of the massive sulphide body at depth. Hole LA-13, a cross scissor hole drilled on the same section as holes LA-10 and LA-06 in a northerly direction returned 19.09 metres grading 3.07 per cent Cu, 3.91 per cent Zn, 2.03 g/t Au and 33.01 g/t Ag. This is the second-widest massive sulphide drill intercept on the project. The company's estimated true width of the massive sulphide body at this point is between 15 to 19.09 metres.
AND ANALYST SAID IF TRUE WIDTH IS AROUND 20 METRES....IT CAN GO OVER $2.00