Montalva is one of the two projects not connecting to a distribution line. We are connecting to a high voltage 115kV transmission line. There is enough capacity in AC terms for 80MWac/160MWdc capacity on the existing transmission line.
For phase II of 160MWac/320MWdc we will upgrade 5 miles of the 115Kv line with a double circuit to the 115Kv/230Kv high voltage transmission system.
***** Distribution is 69Kv and below. Transmission is above 69Kv.
Best
Jeff