RE: RE: RE: Hole 12-03 Agreed. I doubt any samples were sent to the lab also.
An interesting point....over at the Rain deposit, over 1,000 holes were drilled. GV's 12-1 is better than any of the 1,000 holes drilled at Rain. A good start I would say.
Have a great day.