RE: Adding to Strike Thats alot of tonnes of ore. My rough neophite calculations;
(using 2.43g/cu cm = approx 2.5 tonnes/cu. meter from Calvista report in May).
Macchuca 1 = 200m X 140m X 240m = 6,720,000 cu.meters X 2.5 tonnes/cu.meter = 16,800,000 tonnes
Based on grades from Calvista to the SW and Mascota Ext to the NE a reasonably conservative grade should be about 2.5g/t = 16,800,000 X 2.5 = 42M grams / 31.1 = 1.35M oz
This seems really promising for just this one area of Machuca - any geologist types out there that can confirm these numbers?