LBNK's progress on its 2 major projects LithiumBank Resources (LBNK.v LBNKF) has made major progress with its 2 main lithium-brine projects.
LBNK conducted a hydrogeological study on its Kindersley Lithium-brine project which identified multiple zones of potential lithium brine production and showed that a formation on the project may be able to produce 1,600 m3 of Li brine per day
As for its flagship project, Boardwalk Lithium, LBNK recently filed a technical report which showed that the project has 393,000 tonnes of Indicated LCE at a grade of 71.6 mg/L and 5,808,000 tonnes of Inferred LCE @ 68.0 mg/L lithium.
So far the results have been very promising and IMO more developments on either of these projects could act as catalysts for LBNK.
https://www.lithiumbank.ca/index.php/news/2022