RE:RE:The starter pit that Cypress will develop
The original grades were 160 PPM. and they pump it into ponds for evaporation (12 to 24 months ) depending on weather.
The point is even if we took the lithium our the clays and made it into a brine we would produce up to 10 times the amount Abermarle does in each pond.
You could even add it too ALB ponds to increase there anual production.
My bet is the PEA will show we can produce battery grade lithium for well under $4000 a ton. If that is the case we will be a low cost producer.