amateur noise and insectsthe mud slinging and doubts continue and yet QH has said they are doing the right thing by
how they are drilling.
We know we have the Keats and still expanding now a lot at depths which requires more
time to drill but still at that consistant 30 degree angle.
We know we have the Lotto and Golden Joint and less assuredly JPB.
We have the Dave ongong.
But we have establish what is between these zones and the North Keats to Golden Joint
which by my recollection is just a kilometer away.
Golden Joint runs I belive at 45 degrees so will it run towards the highway like Keats?
From the last announcement we have a good low grade system at very shallow depth
but it is an indicator that things will be a lot richer going deep and may very well be
a continuation of the Golden Joint?
Man so complex plumbing in these burritos (reference to QH talks about these systems).
Go to the company presentation Page 16 to look at map of what I am talking about.
Cockroaches need not respond. IKE