Comment by
snooker1797 on Jul 07, 2022 11:40am
Hello Retiredgeo, in your opinion are they to be considered good ?
Comment by
Retiredgeo on Jul 07, 2022 12:50pm
LAB is getting the same mineralization NFG is getting but over shorter widths. A minimum stope width is 1.5 m. If the ore vein is only 0.5 m wide 2/3 of all the rock removed is going to be waste rock. That greatly reduces the economic viability of the project. The really need to find better somewhere on their property.
Comment by
snooker1797 on Jul 07, 2022 1:07pm
thanks, i was thinking that also just wanted a professional opinion as i know very little geology