Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Nicola Mining Inc V.NIM

Alternate Symbol(s):  HUSIF

Nicola Mining Inc. is a Canada-based junior mining company. The Company maintains a 100% owned mill and tailings facility, located near Merritt, British Columbia. The Company owns 100% of the New Craigmont Project, a high-grade copper property, which covers an area of approximately 10,913 hectares (ha) along the southern end of the Guichon Creek Batholith and is adjacent to Teck Resources Ltd.'s Highland Valley Copper. The Company also owns 100% of the Treasure Mountain Property, which comprises approximately 51 mineral tenures, 21 legacy claims: 100 cell units, and five crown grants for a total of approximately 2,850 ha. The Company’s Merritt Mill Property is host to an active run gravel pit, which is located on District Lot 4234. Situated in the heart of the Thompson-Okanagan mining district, the Merritt mill and tailings site consists of approximately 980 acres of fee simple land. The Company also maintains a 75% economic interest in the Dominion Creek Property.


TSXV:NIM - Post by User

Post by stockwatcher7on Apr 10, 2024 12:17pm
48 Views
Post# 35981392

NIM mill processed bulk sample for Blue Lagoon 95%

NIM mill processed bulk sample for Blue Lagoon 95%https://bluelagoonresources.com/wp-content/uploads/2022/02/ACS_Dome_Mountain_TR_2021_FINAL.pdf



13.1 Metallurgical Testwork Material from the Dome Mine was processed in two separate batches at the Nicola mill in Merritt BC. The first batch was processed from June 13 to September 12, 2016, and the second batch from October 12 to November 16, 2016. Approximately 100 wet metric tonnes of material were processed each day through the mill. The material was transported from Smithers B.C. to Merritt via haul trucks and were weighted at the mill site on a truck scale. The first batch of ore weighed 4,583 wet tonnes and the second batch was 2,108 wet tonnes for a total of 6,691 tonnes. At the mill, processing involved crushing, grinding, conditioning, rougher, scavenger and cleaning flotation and filtering of the flotation concentrate. The material was crushed to minus 3/8 inches and ground in a 6.5 ft x 10 ft ball mill. The average grind was 90 microns or 75% minus 200 mesh. The mineralized material was then conditioned with reagents and floated. The rougher flotation concentrate was cleaned to produce a cleaner concentrate. The recovery in the second batch of ore was higher than the first batch primarily due to additional reagents added to the scavenger cells. The average flotation time in the mill was 88 minutes at 4 tonnes/hour. The cleaner concentrates were shipped to a smelter in China. A flow sheet of the mill is shown on (Figure 13.1). The gold recoveries for both batches were estimated at 91.0% for the first batch and 95.3% for the second batch for an overall recovery of 92.6. Silver recoveries were not estimated as there were no assays on the heads and tails. Gold assays for the heads and tails were done at ALS Labs in Kamloops, BC. The Company is currently carrying out a second test milling project at the Nicola Mill. Trucking of the Dome Mountain mineralized material, began on June 14, 2021, and over 4,000 tonnes of the Dome Mountain mineralized material has been delivered to the Nicola mill in Merritt. Processing is on-going but to date, 136.8 tonnes of concentrate averaging 92 g/t gold and 477 g/t silver has been produced and shipped (Blue Lagoon News Release, September 16, 2021).