RE: RE: RE: RE: From another board
RE: RE: RE: RE: From another boardTo achieve 3MW installed capacity with a 1.5MW you need double everything that you would with a 3MW platform. The installed cost would be less for larger machines on a per MW basis but higher per machine. FVR claims 800mil for 296MW or appx. 2.7mil per MW. They are in complex terrain. The offshore machines are getting larger all the time to get installed costs per MW down. 10MW platforms and larger may be possible by 2014.