RE:RE:RE:RE:E-man and frellait .. amateurs here is the proof LLG never built a demo plant and this is the reason why they haven't commited clients on signing offtakes.
A demo plant is KEY toward commercialization. The significance is twofold:
- Scale: Demonstrated production will be done at a large-enough scale to make meaningful conclusions and enhancements to the process to improve confidence in a full-scale operation.
- Using its own ore: NOU will be testing material from its own deposit, which is key for fine tuning the process. This will allow increased confidence in NOU’s ability to produce a concentrate that reflects the flake distribution of the ore, which is key to realize and maximize the value of the deposit (i.e. purified flakes that match the deposits distribution, separated).
The demo plant will also have a production line for USPG and expanded graphite and this will be done in 2019.
electriqueman wrote: educated me ???
Tu ne comprends rien ... que se soit un demo ou un pilot plant...ca ne change rien au fait que NOU a construit un demo plant pour qualifier son graphite pour de la PREMIERE TRANSFORMATION alors que LLG fera un pilot plant pour qualifier son graphite pour de la 2e transformation.
LLG est deja capable de faire la 1ere transformation et fera son pilot plant pour qualifier son graphite de 2e transformation. Pour du graphite spheroniser et enrober pour les batteries.
Ce n'est pas dure de faire seulement de la premiere transformation (extraction de la mine). Par contre, pour faire du graphite enrobe et spheroniser pour les batteries, il faut beaucoup de temps et d'etudes. C'est ce que LLG a fait durant les 2 dernieres annees. Maintenant LLG veut tester les resultats obtenu en recherche avec un pilot plant pour de la 2e transformation.
Je m'excuse mais c'est moi qui fait ton education mon novice...