Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Pure Energy Minerals Ltd V.PE

Alternate Symbol(s):  PEMIF

Pure Energy Minerals Limited is a Canada-based lithium resource developer company, which is engaged in the acquisition, exploration and development of mineral properties. The Company's primary project is the Clayton Valley Project (CV Project), which is located in Clayton Valley, Esmeralda County, Nevada. The CV Project is located in central Esmeralda County, Nevada, approximately halfway between Las Vegas and Reno, Nevada, United States. The Clayton Valley Project contains an inferred mineral resource of approximately 218,000 tons of lithium carbonate equivalent (LCE). In addition, the Company is focused on new processing technologies for lithium through its collaboration with global technology partners, Tenova Advanced Technologies, at the process testing, engineering, and design stage on the Clayton Valley Project. The Company's subsidiaries include 0891884 B.C. Ltd., Esmeralda Minerals, LLC, 1056625 B.C. Ltd., 1061582 B.C. Ltd. and LT Capital Holdings, LLC.


TSXV:PE - Post by User

Bullboard Posts
Post by absentlooking64on Apr 29, 2015 2:33pm
53 Views
Post# 23677295

News

News
Pure Energy Minerals Limited (TSX VENTURE: PE) (FRANKFURT: A111EG) (OTC: HMGLF) (the "Company" or "Pure Energy") is pleased to report it has now completed its initial 2015 drill program at its Lithium Brine Project in Clayton Valley, Nevada. As reported previously (https://www.pureenergyminerals.com/pure-energy-completes-successful-drilling-and-initiates-lithium-brine-pump-testing-program/) the Company successfully drilled and completed the installation of its test production well CV-1 to a total measured depth of 275 m (900 feet). The Company through its operator, GeoXplor Corp., has now successfully drilled the CV-2 exploration well to a total depth of 296 m (970 feet). CV-2 is located 1 km to the south of the Company's CV-1 drill hole. On site observations confirmed that brine-like fluids were intersected from 198 m (650 feet) depth to total depth at 295 m (970 feet), resulting in a minimum intersected interval of approximately 100 m. These fluids are very likely present within the same brine-bearing horizon which was identified in CV-1, from 140 -275 m depth. Robert Mintak, CEO of Pure Energy, commented, "Our team is extremely pleased about the 100% drilling success rate. We are very encouraged by the results from these test wells, as it confirms the lateral continuity of a pervasive mineralization zone that potentially extends even deeper beneath our exploration area." Data collected from this exploration program will be used to support an Inferred Resource estimate (NI 43-101 compliant) that is being written for the lithium brines present beneath Pure's Clayton Valley prospects.
Bullboard Posts