RE:RE:RE:Drilling of the first hole should be done by now.True enough.
There's also the time needed to move the rig between locations to be factored in to the equation.
And, prior to moving, time required to run all tests.
And I believe the set-up for the third hole location will involve analysis of the newly acquired seismic to assist the precise spot of the drill.
Lots of data being gathered while we wait.