Drilling to dateTo date, 45 drill holes have been completed for a total of approximately 4,300 metres.
Lots of holes with lots of assays coming down the road. Average length of hole is about 100m. Shallow. I'm assuming they are finding it worth plugging the vein system close to surface over and over. With a great intersection in the first hole, plus grab samples at surface up to 4000 g/t, we could see some great results down the road. Good start to this play!