Heads upPCM 0.09 now, dirty cheap...20 holes pending.
2.1% Copper and 0.15% Molybdenum or 3.0 lbs/ton Molybdenum Reported in Hole 87 Over 12 Meter Interval 10/11/2007 10:57:01 AM
Pacific Comox Resources Ltd.: 19 Meters Grading 0.23% Copper and 0.062% Molybdenum or 1.2 lbs/ton Molybdenum Reported in Hole 74 10/3/2007 4:30:13 PM
Pacific Comox Resources Ltd.: 10.3 Grams/Tonne Gold and 339 Grams/Tonne Silver Reported Over Interval of 19 Meters Near Surface in Infill Drilling on Carmelitas Zone 9/19/2007 11:33:02 AM