Post by
tarsands on Jan 04, 2021 4:32pm
News yet too come
Scottie is now targeting a total of 7,000 metres of drilling during the 2020 summer field season. (AUG 13th 2020)
During the 2020 field season, Scottie completed a total of 7040 metres of diamond drilling - assays for 38 holes are currently pending, and subsequent drill hole results will be released in batches as they become available. (OCT 6th 2020)
Also on OCT 6th 2020 NR they announce 4 holes ( 3 holes from Blueberry) & 1 hole from (Scottie Gold mine or called O Zone)
Dec 8th 2020 NR we get 3 more holes announced from Blueberry Zone basically these 3 holes were said too be right next too or very very near the old Granduc Road.
So with those 3 holes and the 3 holes from Oct 6th we have a total of 6 from blueberry zone.
And then this taken from Dec. 8th 2020 NR :
A total 1609 metres in 11 holes were drilled into the Blueberry Zone during 2020. Future drill campaigns will increasingly step out along strike and at depth to further define the extent and grade of the zone.
They have already announced results from 6 holes of the 11 holes drilled into Blueberry thus far this year. So 5 left in the lab from Blueberry alone.
We already have gotten 6 holes from Blueberry and 1 hole from O Zone.
35 holes are left too report as of today! My rational guess! LOL>
Plus other news of grab samples are yet too come from their field work.
Lotsa news flow yet too come.
Comment by
amxjavelin on Jan 05, 2021 12:11am
Right on Tarsands thanks looking forward to news here