TSXV:TLC.P - Post by User
Comment by
Paracelsuson Mar 29, 2011 7:37pm
![](https://assets.stockhouse.com/kentico-cms/0341-00/images/Sprite.svg#id_Post_Views_Icon)
183 Views
Post# 18358398
RE: RE: RE: RE: RE: RE: march 2011 Just the facts
RE: RE: RE: RE: RE: RE: march 2011 Just the factsThe time frame I got was sometime in May there should be some drilling. The figure is for oil in place which is not the same as a proven reserve that is producing. It is heavy oil as well in Nordegg. We will want to see high Initial Production figures as well as Stable Production. The drilling will be deeper than earlier wells to test and shock the shale rock through hydraulic over-pressuring techniques and the use of horizontal drilling. I am not a client of RBC, so perhaps someone else could take that on.