RE:RE:RE:RE:RE:Spring in the triangle
to finish goldstoem? To what end? For feasibility? 1. They haven't yet found the "edges", so anyone's answer is a guess until the ore body constraining features are delineated. 2. Assuming say hypothetically that we has already defined the ore body, there would still be hundreds of thousands left to go for feasibility. This is a very early stage play. I am hopeful that infil drilling on GS this year will better outline some of the high grade pockets or seams 2. Grades. The grades have shown to strengthen on trend to the North, this is a kyba consistent feature I believe. Who knows with PSZ, until drilled. Initial grades on test hopes drilled last year were very poor. They chalked this up however to "drilling at the periphery" due to permits. This hopefully is true, or could be just promo. This is certainly not a high grade play. I'd be thrilled if we could get GS over 1gpt gold and 1.4 or so EQ. 3. Eureka - who knows. However, higher grade, near surface would significantly derisk this project.