SEA has acquired a higher grade starter pitAs they are closing the deal for the snowfield deposit this month. Snoefield has about 145 million tonnes of near surface gold grade 1.45 grams a tonne. It would be the ideal capex coast payback vehile for the whole ksm project.. This is what I have assumed the snowfield's purchase is all about. This is a prelude I hope to Sea clinching a deal with a major.... Defining a tunnel route would be the last obstacle in the way for a major to do a KDM deal with seabridge...Mining the mitchel and snowbridge deposits as one was one of the initial options between pretium and sea. It is in the literature somewhere that the higher grade snowfield materilal would be mined first so they could pay back their capex cost rapidly....