Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Bullboard - Stock Discussion Forum Ximen Mining Corp V.XIM

Alternate Symbol(s):  XXMMF

Ximen Mining Corp. is a Canada-based company, which is engaged in the acquisition, exploration, and evaluation of its mineral property interests located in British Columbia. The Company’s Brett Gold Project is situated in the North Okanagan region of southwest British Columbia approximately 29 kilometers (km) west of Vernon. Its Gold Drop Property is located about nine kilometers northeast of... see more

TSXV:XIM - Post Discussion

Ximen Mining Corp > Update of Activities Kenville Gold Mine
View:
Post by Flo66xx on Sep 26, 2023 2:45pm

Update of Activities Kenville Gold Mine

Ximen Mining Provides Status Update of Activities Prior to Commencement of Underground Development at its 100% Owned Kenville Gold Mine


VANCOUVER, BC / ACCESSWIRE / September 26, 2023 / Ximen Mining Corp. (TSX.v:XIM)(FRA:1XMA)(OTCQB:XXMMF) (the "Company" or "Ximen") is pleased to provide an update on activities at its Kenville Gold Mine project in southeastern BC.

"We are pleased by the significant progress we have achieved to date in finalizing the conditions under our current permits. Once these conditions are satisfactorily met, we will commence development at the Kenville Gold Mine site. In the meantime, as we embrace the virtue of patience, we remain steadfast in advancing the other 100% owned gold assets in our portfolio. "Our strategic efforts position us optimally for the anticipated resurgence in the gold sector, which, with a little luck, will help shed light as we navigate the current market challenges," stated Anderson, CEO of Ximen Mining Corp

The Company is steadfastly working with its consultants to complete the engineering studies that are required prior to starting mine development.

Activities completed:

  • Hydrogeological assessment completed and sites selected for two ground water monitoring wells. Proposed sites submitted to regulatory authority for approval.
  • Engineering assessment completed for contact water capture and conveyance for area of new portal and rock dump.
  • Engineering assessment of drainage channel completed. As a result of this study and requirements associated with a required water licence, a new road crossing and new discharge point are now required. The initial design has been completed. An application for an archaeological permit to investigate the new discharge site was submitted.

On-going Technical Activities

  • Waiting on final approval drill monitoring wells and install groundwater monitoring equipment.
  • Finalization and approval of road crossing design. Archaeology permit to be obtained to conduct archeological supervision at new discharge point prior to construction (Estimated 4 months from submission ).
  • Mine water conveyance pumping system engineering design underway to be finished .
  • Complete mine engineering detailed design drawings for mine excavations including drill cut-outs, re-muck cut-outs, safety bays and sumps.
  • Completion of Geotechnical stability assessment of existing mine-site building foundations and mine roads.
  • Completion of Geotechnical design for 2 historic portals and new portal closures.
  • Obtain explosives storage and use permit. Discussion held with regulatory officer indicates site inspection and final use permit to be completed close to commencement of operations.
  • On-going water flow monitoring.

The process of completing all the above technical works is required prior to commencing the start of underground development. The Company is fully committed to addressing these items in a timely and efficient manner and is very much looking forward to then starting the underground mine development on the 100% Company owned Kenville Gold Mine no matter the weather or the season.

 
Comment by Freddy1989Germa on Nov 19, 2023 9:10am
So far, the company has only been burning money and its CEO is known to have gone bankrupt with another company ....   wow what an investment   they should start production in 2020 .....many mines are starting production despite the pandemic that they are the miners who can do it
The Market Update
{{currentVideo.title}} {{currentVideo.relativeTime}}
< Previous bulletin
Next bulletin >
{{currentVideo.companyName}}
{{currentVideo.intervieweeName}}{{currentVideo.intervieweeTitle}}
< Previous
Next >
Dealroom for high-potential pre-IPO opportunities