OTCPK:AETLF - Post by User
Comment by
Oxyuridon Aug 24, 2006 11:09am
651 Views
Post# 11266928
RE: egypt drilling
RE: egypt drillingThey have NO control over the drilling schedule!! That belongs to TGL. I wouldn't be terribly surprised if it was eventually pushed back to the 1st Qtr 2007; rig availability is tight.
GLTA
Cheers,
Oxyurid