Spoke to D.WedmanUnfortunately, it was bad luck that a CTO occurred. The good news, a lift of the CTO is immediate, and by next wed. trading resumes. On the tech report, the BCSC would not accept historical data , and the last few years of historical assay results, so those totals have not been included in the N43 101.
On the Silver Hart project, there are another 15-20 ore bodies, still not drilled out, so Mr. Wedman , estimates this mine will go on for 10 years with a possible 10 million oz of silver totally inferred.
In the meantime, the company is re applying for the mine permits, etc. now that the CTO is lifted, and he figures, the mill will be commissioned to process the stock pile of ore in Sept. 2010.
There was also talk of having just one central mill to process the ore from Silver Hart, Logjammer, and Wheelbarrow sites.
CMC will be back on track, before you know it. GLTA