Pay IntervalDST #5, Lower Mirador, perforated 14,297 - 14,292 ft, 5 ft: Coiled tubing was run to 6,000 ft and 500 standard cubic feet per minute of Nitrogen was pumped to remove the fluid cushion, and achieved a drawdown of approximately 17%. Fluid production rates averaged 2,225 bbls/day of 20.7 degree API oil with a trace of water during the test.
Is caution warranted here? 5 feet of pay isn't much to get excited about, I would have thought...?