100% OWNED by DynaResource de Mexico, SA de CV; 15 SquareKilometersMineralized Area; Historic Production of 1 M Oz. Gold, BonanzaGrades;+3 M. Gold Oz. Potential; Recent High Grade Production:
-
4,750 Oz. Gold Produced at San Pablo Area in 5 Months Production, 2003; Average Grade of 25 G/T; 90 % Recoveries.
-
>18,250 Oz. Gold Produced through June 30, 2006; Overall Average Grade of Approx. 20 G/T; Average Production Cost of Approx. $ 175 / Oz.
-
Transitioning in 2006 to Focus on Exploration / Drilling.
-
Documented Production of 1,000,000 OZ. Bonanza Grade Gold through 1910.
-
+ 3 Million Oz. Gold Potential.
-
Approximately 1,100,000 OZ. Gold (DynaResource, Inc. Company "In- House" Estimate of Resource from 1997-98 and 2007-09 Drill results; and at March 31, 2010). Note that the In-House "Estimate of Resource" is NOT a NI 43-101 Compliant Mineral Resource.
-
>Property fully acquired (approx. $ 3.5 M. US).
-
Surface Rights Agreement Completed.
-
$ 2 Million USD Exploration Program Completed. (1997-1998).
-
$ 10 Million USD Exploration Program Completed. (2007- December 31, 2009).
-
$ 8 Million USD Continued Exploration Program Projected thru March 15, 2011.
-
Confirmation of Significant Vein Deposits; With Bonanza Grades (see Maps and SJG Target Table):>
-
Tres Amigos/La Cecena; La Cecena/Los Hilos; Los Hilos/Santa Rosa; Total 1.4 Km. Strike Length; Potential + 400 M. Down Dip; Potential + 500,000 Oz.
-
San Pablo; Recent High Grade Production; San Pablo Ore Shoot confirmed over 500 Meters Length and + 400 Meters Down Dip; Average Grade of + 8 g/t.; Potential + 500,000 Oz.
-
La Union / Veta Tierra; La Union / La Parilla; La Union / La Prieta; Potential 5 veins X 1.5 Km. Strike Length; Potential + 400 M Down Dip; Potential + 250,000 Oz.
-
Palo Chino; Potential Surface Mine able; Potential + 400 M. Down Dip; Parallel La Purisima.
-
La Purisma; Past Production 470,000 ounces Gold at Average Grade of + 66 g/t.; Potential + 500,000 Oz.
-
La Prieta; Past production 250,000 ounces gold at average 0.9 oz/ton; Additional Flat Zones Potential.
-
Argillic Zone; (Bulk Mining Potential).
-
Location of Bulk Tonnage potential at Palos Chinos; (15 meters @ 3 grams/ton; 7m @ 7 grams/ton).
* 200 TON / Day Flotation Mill in Place; Operational at April, 2003; Currently suspended to Focus on Exploration / Drilling.
-
Overall Production expected at < $200. / Oz.
-
Metallurgy Program Completed:
-
Confirmed 95% recoveries.
-
Basic Gravity / Flotation circuit.
-
Potential Heap Leach (see 1000 ton/day heap leach pro forma).
-
Projected 3 Phase Exploration / Drilling Programs; to be Provided for and Funded Pursuant to Formal "EARN - IN Agreement" signed on September 1, 2006; with Gold Group Resources, Inc., Vancouver, BC.:
-
$ 3,000,000. USD.; Completed.
-
$ 3,000,000. USD.; Completed .
-
$ 12,000,000. USD.; In Process ($ 8 Million Balance at January 2010).