Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Callinan Royalties Corporation CCNMF



GREY:CCNMF - Post by User

Post by bobcat16on Apr 18, 2011 2:45pm
440 Views
Post# 18448072

GREAT RESULTS!!!!!!!!!

GREAT RESULTS!!!!!!!!!
Callinan Mines Ltd
Symbol C : CAA
Shares Issued 49,087,121
Close 2011-04-14 C$ 3.00
Recent Sedar Documents

Callinan drills 13.26 g/t Au over 4.3 m at Gossan

2011-04-15 10:18 ET - News Release

Mr. Mike Muzylowski reports

GOSSAN HILL RESULTS SHOW GREATER WIDTHS, DRILLING TO COMMENCE AT PINE BAYCANADA

Callinan Mines Ltd. has received complete assays from its recent drill program at Gossan Hill in Northern Manitoba. All 32 holes completed as part of the program returned gold and silver mineralization in encouraging widths and concentrations.

The company has also received assays of additional samples from previously reported diamond drill hole GOS 28. With the new samples incorporated, the zone now averages 4.60 grams of gold per tonne and 15.13 grams of silver per tonne over 23.81 metres of core length. The intersection occurs between 267.99 metres and 291.80 metres.

Hole From To Width (m) Au g/t Ag g/t GOS028 267.99 291.8 23.81 4.60 15.13Incl. 287.5 291.8 4.3 13.26 54.46GOS029 282.88 285.5 2.62 4.65 4.17And 297.9 303.03 5.13 1.55 2.58GOS030 309.5 325.41 15.91 4.21 12.69Incl. 321.57 325.41 3.84 7.43 28.52GOS031 251.42 252.13 0.71 1.03 3.00GOS032 365.77 367.03 1.26 1.15 0.97GOS032 375.7 381.8 6.10 0.82 1.22Incl. 375.7 377.12 1.42 1.35 3.83True widths are estimated to be 60 per cent of core widths.        

Additional widths of lower-grade gold and silver mineralization are present on both sides of the main zone reported above.

The Gossan Hill property consists of 3,679 hectares of mining claims near the town of Cranberry Portage, Man. The claims are the host of a historically producing mine, as well as the alteration zone that hosts the mineralization. The winter drilling program at Gossan Hill consisted of 32 holes (one abandoned) for a total of 5,997 metres, before the program was suspended for spring breakup.

The company plans to conduct a summer program at Gossan Hill, consisting of of an extensive mapping and sampling program designed to expand the company's understanding of the gold-bearing structure, and search for similar structures along the alteration zone. The summer program will also include continued diamond drilling to further expand the zone of mineralization. Future plans also include a laboratory bench test to determine the recovery rate of the gold and silver.

Callinan Mines maintained a quality assurance/quality control program at all stages of exploration. Drill core recovery was calculated, measured and recorded at the Gossan Hill property before being cut and sampled. Samples were split in half, one-half of each sample being kept for storage and the other half placed in a prelabelled plastic bag, tagged with the sample number and recorded in the log. Callinan quality assurance/quality control samples were inserted into the group of samples and shipped to Acme Analytical Laboratories in Vancouver, B.C., where they were crushed, split, and pulverized to 250-gram samples at 200 mesh. Pulp samples were then assayed by Aqua Regia digestion inductively coupled plasma emission spectroscopy analysis (24 elements) and assayed for gold and silver by fire assay method. The lab employs internal quality control by assaying pulp duplicates and inserting quality control standards of predetermined values and a blank sample.

Pine Bay

The company has received drilling permits for their Pine Bay property in Northern Manitoba, near Flin Flon.

The Pine Bay property is the host of a known volcanogenic massive sulphide deposit, estimated in 1973, by engineering firm Watts Griffiths and McOuat to contain 607,978 tonnes grading 3.93 per cent copper. Readers are cautioned that estimates are historic in nature, do not comply with national instrument 43-101 and should not be relied upon.

Since acquiring the property, by way of option, in July of 2009, Callinan has conducted both airborne and ground-based electromagnetic surveys over the known zone, isolating drill-ready targets along strike and down plunge. Drill testing will begin immediately to ascertain if the known mineralization is part of a deeper, more extensive system. The company also plans to conduct in-hole geophysics to isolate possible extensions and undiscovered mineralized lenses.

Proposed spinout

Callinan is currently proposing a reorganization that will see its exploration properties, including the Gossan Hill and Pine Bay properties, become part of a new exploration company by way of plan of arrangement. Pending shareholder approval at a special meeting to be held on June 7, 2011, Callinan's shareholders of record on the effective date, which will follow shortly after the meeting date, will receive shares of the new exploration company by way of distribution.

All of Callinan's exploration programs are conducted under the direction of J.J. O'Donnell, PGeo, a qualified person as defined by national instrument 43-101, who has reviewed and approved the contents of this release.

We seek Safe Harbor.

Bullboard Posts