Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Waldron Energy Corporation T.WDN



TSX:WDN - Post by User

Bullboard Posts
Post by Enersolon May 24, 2011 6:35pm
367 Views
Post# 18620154

NEWS RELEASE

NEWS RELEASEWaldron Energy Corporation (TSX:WDN) ("Waldron" or the "Corporation") announces that its horizontal Strachan 2-29-37-8W5 well (the "2-29 well") has been drilled with completion operations ongoing. The 2-29 well was drilled to a measured depth of 4,064 meters in the Glauconite Formation with the length of the horizontal being 1,072 meters. The entire 1,072 meter horizontal leg encountered very good reservoir with 22 meters of vertical net pay, with approximately 400 meters of 12-15% porosity, 500 meters of 9-12% porosity and 150 meters of 6-9% porosity. Waldron initiated a ten-interval fracture stimulation program with the first two intervals being successfully stimulated. Subsequently, a crack occurred in the heel of the frac string and the remaining seven intervals were not stimulated. Currently, the 2-29 well is flowing up the 4 1/2 inch frac string on continuous production, at approximately 3.0 MMcf/d of liquids rich natural gas while recovering the frac oil with 31 MPa of down-hole pressure. The Corporation is planning on patching the frac string, at a budgeted cost of
.5 million, and will then continue to fracture stimulate the remaining intervals. The Corporation anticipates the timeframe to engineer and install the patch to be approximately 30 days with completion operations to follow.
Bullboard Posts